In the region for the creation of industrial zones allocated 940.9 hectares of land. To date, 200.5 hectares of land (22.0%) for 36 projects worth 192.2 billion tenge have been developed from the allocated land plots. About 6.7 billion tenge was allocated from the budget for the construction of infrastructure. Each Industrial zone has a developed infrastructure (energy and water supply, natural gas, etc.).

Of 36 projects, 14 projects worth 1.2 billion tenge were implemented, where 271 jobs were created.

The total volume of investments in the industrial zone is about 44 billion tenge.

At the end of 2017, the volume of production under the projects amounted to 654 million tenge, which increased by 2.2 times (290 million tenge) compared to the same period in 2016.

In 2018, it is planned to implement 5 projects with a cost of more than 100 billion tenge.